Connell's Camp Outlook - History

Development and Regulatory History of the Connell Juvenile Rehabilitation and Labor Housing Facility

A comprehensive chronological synthesis of the development, operation, and legal history of the facility variously known as Second Chance, Camp Outlook, and Helios Nursery in Connell, Washington. The following analysis is derived from a chronological log of administrative, legal, and operational documents spanning from the mid-1990s to 2023.

The facility’s history is defined by a nearly three-decade trajectory of regulatory friction, frequent administrative extensions, and significant legal litigation. Originally proposed in 1995 as a "Juvenile Offender Basic Training Camp" (Second Chance/Camp Outlook), the project required complex siting in an agricultural zone through Special and Conditional Use Permits (SUP/CUP).

Key takeaways include:

  • Permitting Instability: The facility operated under a cycle of permit extensions and "conditional" approvals that lasted decades, leading to documented administrative confusion.
  • Legal Conflict: A major legal battle between Pioneer Human Services and the City of Connell culminated in a 2009 Superior Court decision in favor of Pioneer, including a judgment for damages.
  • Operational Transition: The facility’s purpose shifted significantly over time, transitioning from a juvenile rehabilitation camp to temporary worker housing under Helios Nursery.
  • Current Zoning Friction: As of 2023, the site remains at the center of zoning disputes involving high-density residential proposals (Summit Point Estates) and the ongoing use of the land for farmworker housing (H-2A).

Facility Origins and Initial Siting (1995–1996)

The project began as an initiative to establish a juvenile rehabilitation center, often referred to in early documents as a "bootcamp."

  • Initial Proposals: In July 1995, background information was established for a "Juvenile Offender Basic Training Camp." By January 1996, Calvin Jordan Associates and the City of Connell responded to Requests for Proposals (RFPs) for siting the facility.
  • Siting and Zoning: The facility was sited in an agricultural zone, requiring a Special Use Permit (SUP). The Board of Adjustment reviewed the siting in October 1996.
  • Corporate Entity: "Second Chance" emerged as the primary corporate entity, providing background statements and fact sheets to the Governor's Office and City Council to garner support for the camp.
  • First Approval: In November 1996, the Connell Board of Adjustments issued the initial SUP (Case No. 001-96) following a staff report that recommended approval with specific findings of fact.

Infrastructure and Inter-Agency Coordination

The development of the facility necessitated critical infrastructure agreements with state agencies and local utilities.

DateInfrastructure MilestonePrincipals Involved
10/31/1996Request for water line hookup to Coyote Ridge Corrections Center (CRCC).Second Chance to CRCC
1/16/1997Perimeter security lighting and pesticide application approval.Ben-Franklin Health Department
1/17/1997Permission for short platting of the facility site.Art Tackett / Stratton Surveying
1/31/1997Basic agreement to obtain water from CRCC.CRCC and Second Chance
4/17/1997Board of Health inspection identified eight items requiring attention for system approval.Ben-Franklin Board of Health

Administrative Extension Cycles (1998–2004)

Between 1998 and 2004, the facility’s legal standing was maintained through a series of contested or conditional extensions.

  • Legal Interpretations: In January 1998, attorney Robert Swisher provided an opinion stating that the Special Use Permit was non-transferable.
  • Re-branding to Camp Outlook: By late 1998, documentation began referring to the facility as "Camp Outlook." Art Tackett (City of Connell) issued a letter of support for the camp to Governor Gary Locke.
  • Permit Proliferation: The facility entered a period of repetitive "Conditional Use Permit" (CUP) applications. In April 2000, the Board of Adjustment voted for approval of an extension, despite noted "confusion" in later years regarding the status of these permits.
  • Temporary vs. Permanent Structures: By March 2002, land use applications were filed specifically addressing "non-permanent structures," and by 2004, the Board of Adjustments granted a third extension for the use of these temporary facilities.

Litigation: Pioneer Human Services v. City of Connell (2006–2010)

The mid-to-late 2000s were marked by a transition in management to Pioneer Human Services and a subsequent breakdown in relations with the City of Connell.

  • Pioneer Human Services Takeover: In April 2006, Pioneer Human Services began filing land use applications for the site.
  • Board Resistance: While staff initially recommended approval for permit extensions, handwritten notes from 2008 Board of Adjustment meetings indicate "iffy extension support" despite acknowledging an "excellent program progress report."
  • Administrative Objection: In May 2008, the City Administrator filed an objection to the continued use of temporary buildings.
  • Superior Court Action: Pioneer Human Services appealed the City’s decisions. In July 2009, the Superior Court ruled in favor of Pioneer Health Services. By February 2010, the court granted an order for a judgment of $1,264.91 against the City.
  • Final Revised Decision: Alan B. Gunter, Hearing Examiner, issued a revised decision regarding Camp Outlook in August 2012.

September 26, 2015 - Real Estate and Inventory Auction

JOBTC / Camp Outlook properties sold to highest bidders. Article continues below (following auction info).

Transition to Helios Nursery and Labor Housing (2015–2023)

Following the cessation of juvenile rehabilitation activities, the site was repurposed for agricultural labor housing.

Re-purposing and Occupancy Challenges

In September 2015, Jed Crowther (Connell) began outlining "Future Land Use Criteria" for the Camp Outlook property. By 2017, the focus shifted to "Temporary Worker Housing."

  • Certificate of Occupancy (COO) Disputes: A protracted dispute occurred between 2019 and 2021 regarding the COO. The Washington State Department of Health (DOH) initially declined to issue a COO in March 2021, though the City of Connell (Sterling Joyner) issued one. A Statement in Lieu of a previous COO was eventually drafted.
  • Easements: Between 2019 and 2023, several waterline utility easements were surveyed and filed for "Helios Nursery."

Current Zoning Conflicts

Recent documentation from 2021 to 2023 indicates significant friction between the existing labor camp and new residential developments.

  • Summit Point Estates (SPE): This residential project has raised questions regarding access to parcels and proximity to the "Labor Camp Zoning."
  • Zoning Rescission Attempts: In August 2023, there were documented attempts by the City (Cathleen Koch) and AHBL (Nicole Stickney) to "rescind zoning" related to Helios Land Use.
  • High-Density Proposals: In October 2023, changes to the Comprehensive Plan were proposed to allow for "High Density" residential development in the area, potentially further conflicting with the H-2A farmworker housing currently operated by Helios Nursery.

Chronological Summary of Key Permits and Decisions

DateActionAuthority
11/13/1996Issuance of Special Use Permit (001-96)Board of Adjustment
1/28/1997Building Permit ApprovedCity of Connell
4/6/2000Approval of Conditional Use Permit ExtensionBoard of Adjustment
4/4/2002Approval of Conditional Use PermitBoard of Adjustment
4/5/2004Notice of Decision: Application GrantedCity of Connell
6/6/2006Conditional Use Permit ApprovalJed Crowther, Connell
7/21/2009Superior Court Decision in favor of PioneerSuperior Court Judge
3/5/2021Certificate of Occupancy issued for HeliosSterling Joyner, Connell
8/22/2023Certificate of Occupancy (Temp Worker Housing)Helios/DOH
Booker Auction Co. ad placed in Franklin County Graphic (newspaper) during September 2015.
Franklin County Graphic advertising - September 2015